Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 78    Reach ID: T6.02    Stream Name: Pherrins River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 4,205.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 586 ft. 0 ft.  
  Rail Road 612 ft. 0 ft.  
  Berm 398 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 1,596 ft. 0 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 321 ft. 0 ft. 7.6 %
  Impact Low  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration Flood Chute   Project Default
  Impact Not Significant  
6.5 Meander Width Not Applicable Project Default
  Meander Width Ratio 0.0  
  Impact N/A  
6.6 Wavelength Not Applicable Project Default
  Wavelength Ratio 0.0  
  Impact N/A