Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 77    Reach ID: T6.01    Stream Name: Pherrins River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 10,457.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 1,677 ft. 508 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 115 ft. 0 ft.  
  (Old Data) 1,793 ft. 508 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 1,117 ft. 937 ft. 19.6 %
  Impact Low  
6.3 Depositional Features Point   Project Default
  Impact Not Significant  
6.4 Meander Migration Multiple   Project Default
  Impact Low  
6.5 Meander Width 351 ft. Project Default
  Meander Width Ratio 7.1  
  Impact Not Significant  
6.6 Wavelength 171 ft. Project Default
  Wavelength Ratio 3.5  
  Impact High