Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

North Branch Winooski

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 37    Reach ID: T2.03    Stream Name: Minister Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 7,464.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 0 ft. 54 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 775 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 829 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 692 ft. 0 ft. 9.3 %
  Impact Low  
6.3 Depositional Features Point   Project Default
  Impact Not Significant  
6.4 Meander Migration Multiple   Project Default
  Impact No Data  
6.5 Meander Width ft. Project Default
  Meander Width Ratio 0.0  
  Impact No Data  
6.6 Wavelength ft. Project Default
  Wavelength Ratio 0.0  
  Impact No Data