Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Leach Stream

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 5    Reach ID: M07    Stream Name:

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 2,657.1
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 224 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 224 ft. 0 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 376 ft. 126 ft. 18.9 %
  Impact Low  
6.3 Depositional Features Point   Project Default
  Impact Low  
6.4 Meander Migration None   Project Default
  Impact Not Significant  
6.5 Meander Width 38 ft. Project Default
  Meander Width Ratio 1.0  
  Impact High  
6.6 Wavelength 38 ft. Project Default
  Wavelength Ratio 1.0  
  Impact High