Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Leach Stream

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 4    Reach ID: M05    Stream Name:

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 3,255.8
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 520 ft. 371 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 520 ft. 371 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 171 ft. 0 ft. 5.3 %
  Impact Low  
6.3 Depositional Features Mid-channel   Project Default
  Impact Not Significant  
6.4 Meander Migration Not Evaluated   Project Default
  Impact Low  
6.5 Meander Width Not Applicable Project Default
  Meander Width Ratio 0.0  
  Impact N/A  
6.6 Wavelength Not Applicable Project Default
  Wavelength Ratio 0.0  
  Impact N/A