Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Deerfield - North Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 2    Reach ID: T2.01-S1.01    Stream Name: Binney Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 3,203.0
  Data values Metadata
6.1 Encroachments None  Project Default 
  One Side Both Sides  
  Road ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) ft. ft.  
  Impact Not Significant  
6.2 River Corridor Development     Project Default
  Length / Percent 227 ft. 35 ft. 8.2 %
  Impact Low  
6.3 Depositional Features Point   Project Default
  Impact Not Significant  
6.4 Meander Migration None   Project Default
  Impact Not Significant  
6.5 Meander Width 97 ft. Project Default
  Meander Width Ratio 4.2  
  Impact Low  
6.6 Wavelength 314 ft. Project Default
  Wavelength Ratio 13.5  
  Impact Not Significant