Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Waits

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 45    Reach ID: T1.10    Stream Name: South Branch Waits River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 6,600.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 0 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 1,053 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 1,053 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 210 ft. 34 ft. 3.7 %
  Impact Not Significant  
6.3 Depositional Features Multiple   Project Default
  Impact High  
6.4 Meander Migration Migration   Project Default
  Impact High  
6.5 Meander Width 69 ft. Project Default
  Meander Width Ratio 2.0  
  Impact High  
6.6 Wavelength 138 ft. Project Default
  Wavelength Ratio 3.9  
  Impact High