Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Black Creek Mouth

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 37    Reach ID: T4.03    Stream Name: Fairfield River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 3,131.0
  Data values Metadata
6.1 Encroachments None  Project Default 
  One Side Both Sides  
  Road 0 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 0 ft.  
  Impact Not Significant  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration Flood Chute   Project Default
  Impact No Data  
6.5 Meander Width 120 ft. Project Default
  Meander Width Ratio 1.9  
  Impact High  
6.6 Wavelength 420 ft. Project Default
  Wavelength Ratio 6.6  
  Impact Low