Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Black Creek Mouth

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 23    Reach ID: T3.04    Stream Name: Wanzer Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 3,721.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) ft. 446 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features Multiple   Project Default
  Impact Low  
6.4 Meander Migration Braiding   Project Default
  Impact Low  
6.5 Meander Width ft. Project Default
  Meander Width Ratio 0.0  
  Impact No Data  
6.6 Wavelength ft. Project Default
  Wavelength Ratio 0.0  
  Impact No Data