Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Tyler Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 9    Reach ID: M09    Stream Name: Tyler Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 3,405.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 0 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 0 ft.  
  Impact Unknown  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features Multiple   Project Default
  Impact High  
6.4 Meander Migration Braiding   Project Default
  Impact Low  
6.5 Meander Width 214 ft. Project Default
  Meander Width Ratio 3.5  
  Impact Low  
6.6 Wavelength 734 ft. Project Default
  Wavelength Ratio 12.0  
  Impact Not Significant