Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Black Creek Head

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 7    Reach ID: M10T9.01    Stream Name: Trib-9 to Black-M10

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 2,812.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) ft. 899 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 84 ft. 0 ft. 3.0 %
  Impact Not Significant  
6.3 Depositional Features Point   Project Default
  Impact Not Significant  
6.4 Meander Migration No Data   Project Default
  Impact No Data  
6.5 Meander Width 21 ft. Project Default
  Meander Width Ratio 0.8  
  Impact High  
6.6 Wavelength 21 ft. Project Default
  Wavelength Ratio 0.8  
  Impact High