Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

New Haven River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 48    Reach ID: T3.02    Stream Name: Baldwin Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 3,706.0
  Data values Metadata
6.1 Encroachments   1:24K topos, 1:5K orthos, files, field obs. 
  One Side Both Sides  
  Road 0 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 423 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 423 ft. 0 ft.  
  Impact Low  
6.2 River Corridor Development     1:24K topos, 1:5K orthos, files, field obs.
  Length / Percent 182 ft. 0 ft. 4.9 %
  Impact Not Significant  
6.3 Depositional Features Multiple   Project Default
  Impact Low  
6.4 Meander Migration Flood Chute   Project Default
  Impact Low  
6.5 Meander Width 45 ft. Project Default
  Meander Width Ratio 1.0  
  Impact High  
6.6 Wavelength 45 ft. Project Default
  Wavelength Ratio 1.0  
  Impact High