Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Battenkill River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 65    Reach ID: T6.02    Stream Name: West Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 14,106.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 1,360 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 1,360 ft. 0 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 3,000 ft. 495 ft. 24.8 %
  Impact High  
6.3 Depositional Features None   1:5K orthos, field obs.
  Impact Not Significant  
6.4 Meander Migration None   Project Default
  Impact Not Significant  
6.5 Meander Width 46 ft. Project Default
  Meander Width Ratio 2.3  
  Impact High  
6.6 Wavelength 46 ft. Project Default
  Wavelength Ratio 2.3  
  Impact High