Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Battenkill River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 24    Reach ID: T2.01    Stream Name: Roaring Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 2,113.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 634 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 446 ft. 1,378 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 1,080 ft. 1,378 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 1,648 ft. 78.0 %
  Impact High  
6.3 Depositional Features Multiple   Project Default
  Impact High  
6.4 Meander Migration Flood Chute   Project Default
  Impact Not Significant  
6.5 Meander Width 74 ft. Project Default
  Meander Width Ratio 1.0  
  Impact High  
6.6 Wavelength 74 ft. Project Default
  Wavelength Ratio 1.0  
  Impact High