Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 96    Reach ID: T7.01    Stream Name: Trebo Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 4,116.4
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 451 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 218 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 0 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 58 ft. 114 ft. 4.2 %
  Impact Not Significant  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration None   Project Default
  Impact Not Significant  
6.5 Meander Width 17 ft. Project Default
  Meander Width Ratio 1.0  
  Impact High  
6.6 Wavelength 17 ft. Project Default
  Wavelength Ratio 1.0  
  Impact High