Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Dog River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 85    Reach ID: T6.01    Stream Name: Felchner Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 4,529.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 43 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 43 ft. 0 ft.  
  Impact Not Significant  
6.2 River Corridor Development     Project Default
  Length / Percent 367 ft. 0 ft. 8.1 %
  Impact Low  
6.3 Depositional Features Side   Project Default
  Impact Not Significant  
6.4 Meander Migration Flood Chute   Project Default
  Impact  
6.5 Meander Width Not Applicable Project Default
  Meander Width Ratio 0.0  
  Impact N/A  
6.6 Wavelength Not Applicable Project Default
  Wavelength Ratio 0.0  
  Impact N/A