Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 49    Reach ID: M1.19S2.02    Stream Name: Sub Trib 2 to Reach 19 to Stevens Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 5,035.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 522 ft. 261 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 522 ft. 261 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features No Data   Project Default
  Impact Not Significant  
6.4 Meander Migration Migration   Project Default
  Impact Low  
6.5 Meander Width Not Applicable Project Default
  Meander Width Ratio 0.0  
  Impact N/A  
6.6 Wavelength Not Applicable Project Default
  Wavelength Ratio 0.0  
  Impact N/A