Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 137    Reach ID: T7.01    Stream Name: Trib 7 to Stevens Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 4,187.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 564 ft. 460 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 646 ft. 307 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 1,210 ft. 767 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 404 ft. 1,475 ft. 44.9 %
  Impact High  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration Multiple   Project Default
  Impact Low  
6.5 Meander Width Not Applicable Project Default
  Meander Width Ratio 0.0  
  Impact N/A  
6.6 Wavelength Not Applicable Project Default
  Wavelength Ratio 0.0  
  Impact N/A