Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 103    Reach ID: T3.08S1.01    Stream Name: Sub Trib 1 to Reach 8 to Jail Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 1,420.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 0 ft. 118 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 118 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features Point   Project Default
  Impact Low  
6.4 Meander Migration Migration   Project Default
  Impact Low  
6.5 Meander Width 63 ft. Project Default
  Meander Width Ratio 2.9  
  Impact High  
6.6 Wavelength 126 ft. Project Default
  Wavelength Ratio 5.9  
  Impact High