Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 109    Reach ID: T3.10S1.01    Stream Name: Sub Trib 1 to Reach 10 to Jail Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 5,923.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 0 ft. 244 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 244 ft.  
  Impact Not Significant  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration   Project Default
  Impact  
6.5 Meander Width 48 ft. Project Default
  Meander Width Ratio 3.2  
  Impact Low  
6.6 Wavelength 84 ft. Project Default
  Wavelength Ratio 5.6  
  Impact High