Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 108    Reach ID: T3.10    Stream Name: Jail Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 6,210.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 0 ft. 90 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 90 ft.  
  Impact Not Significant  
6.2 River Corridor Development     Project Default
  Length / Percent 156 ft. 0 ft. 2.5 %
  Impact Not Significant  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration Migration   Project Default
  Impact Low  
6.5 Meander Width ft. Project Default
  Meander Width Ratio 0.0  
  Impact No Data  
6.6 Wavelength ft. Not Evaluated
  Wavelength Ratio 0.0  
  Impact No Data