Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 107    Reach ID: T3.09    Stream Name: Jail Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 6,414.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 0 ft. 101 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 101 ft.  
  Impact Not Significant  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features Multiple   Project Default
  Impact High  
6.4 Meander Migration Multiple   Project Default
  Impact High  
6.5 Meander Width 152 ft. Project Default
  Meander Width Ratio 3.5  
  Impact Low  
6.6 Wavelength 333 ft. Project Default
  Wavelength Ratio 7.7  
  Impact Low