Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 87    Reach ID: T3.05S1.01    Stream Name: Sub Trib 1 to Reach 5 to Jail Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 4,068.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 477 ft. 275 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 477 ft. 275 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 958 ft. 1,174 ft. 52.4 %
  Impact High  
6.3 Depositional Features No Data   Project Default
  Impact Not Significant  
6.4 Meander Migration   Project Default
  Impact  
6.5 Meander Width Not Applicable Project Default
  Meander Width Ratio 0.0  
  Impact N/A  
6.6 Wavelength Not Applicable Project Default
  Wavelength Ratio 0.0  
  Impact N/A