Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 6    Reach ID: R07    Stream Name: West River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 11,303.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 3,990 ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) 3,990 ft. 7,303 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 2,625 ft. 1,554 ft. 37.0 %
  Impact High  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration Migration   1:5K orthos (1990s & 1970s), other aerial photos
  Impact Low  
6.5 Meander Width ft. 1:5K orthos (1990s & 1970s), other aerial photos
  Meander Width Ratio 0.0  
  Impact No Data  
6.6 Wavelength ft. Project Default
  Wavelength Ratio 0.0  
  Impact No Data