Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 40    Reach ID: T11.05    Stream Name: Winhall River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 7,344.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 4,486 ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) 0 ft. 0 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 3,828 ft. 641 ft. 60.9 %
  Impact High  
6.3 Depositional Features Multiple   Project Default
  Impact Low  
6.4 Meander Migration None   1:5K orthos (1990s & 1970s), other aerial photos
  Impact Not Significant  
6.5 Meander Width 55 ft. 1:5K orthos (1990s & 1970s), other aerial photos
  Meander Width Ratio 1.0  
  Impact High  
6.6 Wavelength 55 ft. Field - survey
  Wavelength Ratio 1.0  
  Impact High