Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 36    Reach ID: T11.01    Stream Name: Winhall River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 4,066.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 218 ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) 0 ft. 0 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 1,222 ft. 200 ft. 35.0 %
  Impact High  
6.3 Depositional Features Multiple   Project Default
  Impact High  
6.4 Meander Migration None   1:5K orthos (1990s & 1970s), other aerial photos
  Impact Not Significant  
6.5 Meander Width 144 ft. 1:5K orthos (1990s & 1970s), other aerial photos
  Meander Width Ratio 1.8  
  Impact High  
6.6 Wavelength 1,161 ft. Project Default
  Wavelength Ratio 14.7  
  Impact Low