Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Mainstem

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 165    Reach ID: T1.03    Stream Name: Mill Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 10,659.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) ft. ft.  
  Impact Unknown  
6.2 River Corridor Development     Project Default
  Length / Percent ft. ft. 0.0 %
  Impact Unknown  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration None   Project Default
  Impact Not Significant  
6.5 Meander Width 312 ft. Project Default
  Meander Width Ratio 12.2  
  Impact High  
6.6 Wavelength 531 ft. Project Default
  Wavelength Ratio 20.8  
  Impact High