Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Mainstem

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 207    Reach ID: T3.2-S3.01    Stream Name: Pond Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 13,432.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 5,026 ft. 322 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 41 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 0 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 1,190 ft. 186 ft. 10.2 %
  Impact Low  
6.3 Depositional Features Multiple   Project Default
  Impact Low  
6.4 Meander Migration Flood Chute   1:5K orthos (1990s & 1970s), field obs.
  Impact Low  
6.5 Meander Width 118 ft. 1:5K orthos (1990s & 1970s), field obs.
  Meander Width Ratio 3.9  
  Impact Low  
6.6 Wavelength 338 ft. Project Default
  Wavelength Ratio 11.3  
  Impact Not Significant