Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Mainstem

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 241    Reach ID: T6.05    Stream Name: Tweed River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 4,424.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 2,768 ft. 282 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 183 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 2,950 ft. 282 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 288 ft. 25 ft. 7.1 %
  Impact Low  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration Flood Chute   Project Default
  Impact Not Significant  
6.5 Meander Width ft. Project Default
  Meander Width Ratio 0.0  
  Impact No Data  
6.6 Wavelength ft. Project Default
  Wavelength Ratio 0.0  
  Impact No Data