Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Mainstem

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 240    Reach ID: T6.04    Stream Name: Tweed River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 6,156.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 218 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 851 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 1,068 ft. 0 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 2,133 ft. 37 ft. 35.3 %
  Impact High  
6.3 Depositional Features Point   Project Default
  Impact Low  
6.4 Meander Migration Flood Chute   Project Default
  Impact Not Significant  
6.5 Meander Width 266 ft. Project Default
  Meander Width Ratio 6.2  
  Impact Not Significant  
6.6 Wavelength 1,032 ft. Project Default
  Wavelength Ratio 24.0  
  Impact High