Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Second Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 64    Reach ID: M13-S1.04    Stream Name: Unnamed Trib to the Second Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 3,104.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) ft. ft.  
  Impact Unknown  
6.2 River Corridor Development     Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features None   Project Default
  Impact Not Significant  
6.4 Meander Migration No Data   Project Default
  Impact No Data  
6.5 Meander Width 70 ft. Project Default
  Meander Width Ratio 5.6  
  Impact Not Significant  
6.6 Wavelength 221 ft. Project Default
  Wavelength Ratio 17.8  
  Impact High