Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 77    Reach ID: T6.01    Stream Name: Pherrins River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 0 ft. 0.0 %  
  Impact Not Significant  
5.3 Bank Armoring 1:24K topos, 1:5K orthos, files, field obs.
  Left Right  
  Length 810 ft. 694 ft.  
  Percent 14.4 %  
  Length (old) %  
  Impact Low  
5.4 Channel Straightening Project Default
  Length / Percent 2,739 ft. 26.2 %  
  Impact High  
5.5 Dredging History Dredging Project Default
  Impact High