Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 1    Reach ID: M01    Stream Name: Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation None  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 4  
  Reach Length / Percent 0 ft. 0.0 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 1,755 ft. 2,521 ft.  
  Percent 92.6 %  
  Length (old) %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 4,580 ft. 99.1 %  
  Impact High  
5.5 Dredging History None Project Default
  Impact Not Significant