Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Lemon Fair

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 12    Reach ID: M12    Stream Name: Lemon Fair

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type  
  Flow Regulation Use  
  (Old) Flow Regulation Impoundment  
  Impact High  
5.2 Bridges & Culverts Project Default
  Number 1  
  Reach Length / Percent 0 ft. 0.0 %  
  Impact Not Significant  
5.3 Bank Armoring Not Evaluated Project Default
  Left Right  
  Length ft. ft.  
  Percent 0.0 %  
  Length (old) %  
  Impact Not Evaluated  
5.4 Channel Straightening None Project Default
  Length / Percent ft. 0.0 %  
  Impact Not Significant  
5.5 Dredging History None Project Default
  Impact Not Significant