Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Browns River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 15    Reach ID: M15    Stream Name: Browns River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type  
  Flow Regulation Use  
  (Old) Flow Regulation Impoundment  
  Impact High  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 618 ft. 7.0 %  
  Impact Low  
5.3 Bank Armoring Project Default
  Left Right  
  Length ft. ft.  
  Percent 1.1 %  
  Length (old) 100 %  
  Impact Not Significant  
5.4 Channel Straightening Project Default
  Length / Percent 5,298 ft. 60.0 %  
  Impact High  
5.5 Dredging History Gravel Mining Project Default
  Impact High