Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Deerfield - North Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 24    Reach ID: T2.06    Stream Name: North Branch Deerfield River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts 1:24K topos, 1:5K NHD & orthos, files, field obs.
  Number 0  
  Reach Length / Percent 0 ft. 0.0 %  
  Impact Not Significant  
5.3 Bank Armoring None Project Default
  Left Right  
  Length ft. ft.  
  Percent 0.0 %  
  Length (old) %  
  Impact Not Significant  
5.4 Channel Straightening None 1:24K topos, 1:5K NHD & orthos, files, field obs.
  Length / Percent ft. 0.0 %  
  Impact Not Significant  
5.5 Dredging History No Data Project Default
  Impact Not Significant