Record: 39    Reach ID: T4.05    Stream Name: Fairfield River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation No Data  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 0  
  Reach Length / Percent 0 ft. 0.0 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 90 ft. 82 ft.  
  Percent 3.9 %  
  Length (old) %  
  Impact Not Significant  
5.4 Channel Straightening Project Default
  Length / Percent 650 ft. 14.7 %  
  Impact Low  
5.5 Dredging History No Data Project Default