Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Black Creek Head

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 27    Reach ID: M7T7.01    Stream Name: Trib-7 to Black-M07

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type  
  Flow Regulation Use  
  (Old) Flow Regulation No Data  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 3  
  Reach Length / Percent 596 ft. 44.0 %  
  Impact High  
5.3 Bank Armoring Project Default
  Left Right  
  Length ft. ft.  
  Percent 24.2 %  
  Length (old) 328 %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 1,133 ft. 83.7 %  
  Impact High  
5.5 Dredging History No Data Project Default
  Impact Not Significant