Record: 7    Reach ID: M07    Stream Name: Passumpsic

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 841 ft. 15.0 %  
  Impact Low  
5.3 Bank Armoring Project Default
  Left Right  
  Length ft. ft.  
  Percent 58.9 %  
  Length (old) 3,300 %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 3,500 ft. 62.4 %  
  Impact High  
5.5 Dredging History None Project Default
  Impact Not Significant