Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Morehouse Brook

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 2    Reach ID: M02    Stream Name: Morehouse Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 1  
  Reach Length / Percent 143 ft. 10.9 %  
  Impact Low  
5.3 Bank Armoring Project Default
  Left Right  
  Length ft. ft.  
  Percent 0.0 %  
  Length (old) %  
  Impact Unknown  
5.4 Channel Straightening Project Default
  Length / Percent 180 ft. 13.7 %  
  Impact Low  
5.5 Dredging History Project Default
  Impact Not Significant