Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Missisquoi - Canada to Trout

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 28    Reach ID: R19T2.01    Stream Name: Stanhope Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts 1:24K topos, 1:5K NHD & orthos, files, field obs.
  Number 2  
  Reach Length / Percent 400 ft. 28.6 %  
  Impact High  
5.3 Bank Armoring 1:24K topos, 1:5K orthos, files, field obs.
  Left Right  
  Length ft. ft.  
  Percent 29.6 %  
  Length (old) 414 %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 1,392 ft. 99.5 %  
  Impact High  
5.5 Dredging History None Project Default
  Impact Not Significant