Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Missisquoi - Canada to Trout

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 6    Reach ID: R17    Stream Name: Missisquoi River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts 1:24K topos, 1:5K NHD & orthos, files, field obs.
  Number 2  
  Reach Length / Percent 930 ft. 4.0 %  
  Impact Not Significant  
5.3 Bank Armoring 1:24K topos, 1:5K orthos, files, field obs.
  Left Right  
  Length 2,158 ft. 2,348 ft.  
  Percent 19.5 %  
  Length (old) %  
  Impact Low  
5.4 Channel Straightening None Project Default
  Length / Percent 0 ft. 0.0 %  
  Impact Not Significant  
5.5 Dredging History Dredging Project Default
  Impact High