Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

New Haven River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 26    Reach ID: M26    Stream Name: New Haven River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 183 ft. 5.0 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length ft. ft.  
  Percent 51.8 %  
  Length (old) 1,900 %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 800 ft. 21.8 %  
  Impact High  
5.5 Dredging History No Data Project Default
  Impact Not Significant