Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Battenkill River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 27    Reach ID: T2.04    Stream Name: Roaring Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type Small Withdrawal  
  Flow Regulation Use Other  
  (Old) Flow Regulation  
  Impact Low  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 900 ft. 12.5 %  
  Impact Low  
5.3 Bank Armoring Project Default
  Left Right  
  Length 477 ft. 590 ft.  
  Percent 14.8 %  
  Length (old) %  
  Impact Low  
5.4 Channel Straightening Project Default
  Length / Percent 1,082 ft. 15.0 %  
  Impact Low  
5.5 Dredging History Gravel Mining Interviews - DEC, NRCS, Towns, others
  Impact Low