Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Mettowee River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 38    Reach ID: M07    Stream Name: Mettowee River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   1:24K topos, 1:5K NHD & orthos, files
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 5  
  Reach Length / Percent 500 ft. 3.1 %  
  Impact Not Significant  
5.3 Bank Armoring 1:24K topos, 1:5K orthos, files, field obs.
  Left Right  
  Length ft. ft.  
  Percent 73.9 %  
  Length (old) 11,873 %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 1,327 ft. 8.3 %  
  Impact Low  
5.5 Dredging History Gravel Mining Project Default
  Impact Low