Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 12    Reach ID: M12    Stream Name: Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 3  
  Reach Length / Percent 90 ft. 1.3 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 1,554 ft. 1,697 ft.  
  Percent 47.3 %  
  Length (old) %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 1,935 ft. 28.1 %  
  Impact High  
5.5 Dredging History Dredging Project Default
  Impact High