Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Upper Otter Creek

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 18    Reach ID: M30    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 3  
  Reach Length / Percent 1,030 ft. 11.4 %  
  Impact Low  
5.3 Bank Armoring Project Default
  Left Right  
  Length 2,254 ft. 1,881 ft.  
  Percent 45.8 %  
  Length (old) %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 697 ft. 7.7 %  
  Impact Low  
5.5 Dredging History None Project Default
  Impact Not Significant