Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Dog River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 17    Reach ID: M08    Stream Name: Dog River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type Small Withdrawal  
  Flow Regulation Use Other  
  (Old) Flow Regulation  
  Impact Low  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 135 ft. 3.0 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 236 ft. 242 ft.  
  Percent 10.5 %  
  Length (old) %  
  Impact Low  
5.4 Channel Straightening Project Default
  Length / Percent 3,234 ft. 71.3 %  
  Impact High  
5.5 Dredging History Gravel Mining Project Default
  Impact Low