Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Browns River Tribs

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 30    Reach ID: M19S1.01    Stream Name: Trib to Browns

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type Small Withdrawal  
  Flow Regulation Use Recreation  
  (Old) Flow Regulation  
  Impact Low  
5.2 Bridges & Culverts Project Default
  Number 1  
  Reach Length / Percent 38 ft. 0.8 %  
  Impact Not Significant  
5.3 Bank Armoring None Project Default
  Left Right  
  Length 0 ft. 0 ft.  
  Percent 0.0 %  
  Length (old) %  
  Impact Not Significant  
5.4 Channel Straightening Project Default
  Length / Percent 1,263 ft. 25.7 %  
  Impact High  
5.5 Dredging History None Project Default
  Impact Not Significant