Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 137    Reach ID: T7.01    Stream Name: Trib 7 to Stevens Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 6  
  Reach Length / Percent 165 ft. 3.9 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 859 ft. 1,546 ft.  
  Percent 57.4 %  
  Length (old) %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 2,746 ft. 65.6 %  
  Impact High  
5.5 Dredging History None Project Default
  Impact Not Significant